The Data Center Construction Project Manager will be responsible for leading the overall direction, completion, and financial outcome of multiple projects with the construction services, program management, and design of data centers. The ideal candidate will possess the knowledge and experience to manage data center construction project management and have relevant data center experience. The location is in Fort Worth, Texas and the role is on-site .
This role requires direct experience in managing data center construction projects with a strong emphasis on MEP systems, particularly electrical as well as adeep understanding of data center infrastructure, including power distribution, cooling systems, and redundancy protocols. PMP certification or strong project management knowledge (scheduling, budgeting, risk management) is preferred.
You will be the driving force behind ensuring projects are completed on time, within budget, and to the highest standards of quality.
What you will Do:
· Serve as an extension of the client/owner’s design and construction staff overseeing the work of general contractors, designers, and vendors 100% on-site in Fort Worth, Texas.
· Possess the knowledge and experience to manage the construction of data centers.
· Administer the contract with the client and the General Contractor during construction and close out of data centers enforcing the contract to ensure a high level of project administration in accordance with the drawings and specifications provided by the clients design consultants.
· Oversee electrical and low voltage equipment coordination and commissioning and quality assurance.
· Enforce the construction contract with the client to minimize costs and seek to obtain the lowest reasonable costs for the project.
· Monitor and ensure that the General Contractor and all other separate contractors along with base building and site developer and any suppliers of owner furnished contractors and aligned with project goals, scheduling, and other coordinated efforts to avoid scheduling or interference issues.
· Advise client on the schedule implications of any proposed changes to requirements in accordance with the “Model Change Management” system.
· Review third-party inspection reports and verify that any issues are resolved to meet Bureau Veritas and Client satisfaction.
· Assist the team and vendors to plan and complete the commissioning phase of the project including adequate off-site and on-site testing to be completed and documented in time for the handover to commissioning milestone.
· Maintain oversight over General Contractor for all local authority statutory and planning approvals monitoring the GC and Design Consultants to ensure the required information is submitted to the relevant statutory bodies.
· Direct and manage project development from beginning to end.
· Execute stellar client delivery starting with pre-construction services (bid/permit/schedule), construction oversight (construction/change orders/invoicing/punch lists), store start-up and turnover, and project close out.
· Knowledge of construction components, process, and methodologies and cost estimation required.
· Plan and schedule project timelines for multiple projects and delegate to appropriate personnel.
· Present reports defining project progress, problems, and solutions to leadership teams and clients.
· Must have proposal preparation, budget development, forecasting, and financial management experience.
· Knowledge of/experience with web based project management is necessary.
· Read, analyze, and interpret complex construction documents.
· Safety Operate with safety at the forefront of all construction initiatives.
· Oversee electrical and low voltage equipment coordination and commissioning and quality assurance.
What you Need for the Role:
Education and/or Experience:
· B.S. or B.A. degree in Construction, Architecture or Engineering or related degree required.
· Minimum of 10+ years construction project management experience.
· Direct experience in managing data center construction projects with a strong emphasis on MEP systems, particularly electrical.
· Deep understanding of data center infrastructure, including power distribution, cooling systems, and redundancy protocols.
· PMP certification or strong project management knowledge (scheduling, budgeting, risk management).
· The ideal candidate possesses electrical and low voltage equipment coordination and commissioning or quality assurance experience.
· Experience managing projects with a contract value of $25M+
Certificates, Licenses, Registrations:
· Strong consideration will be given to those that are PMP and LEED certified.
· A valid driver's license is with no significant MVA points/violations.
Other Qualifications:
· Local to Fort Worth, Texas.
Benefits:
At Bureau Veritas, we are dedicated to ensuring our employees receive fair and competitive pay, accompanied by comprehensive health and wellness benefits.
Here's a breakdown of what we provide:
Salary range starting at $115,000+
Annual Incentive Bonus Plan
Base Pay is adjusted based on job-related knowledge, skills, experience, and market location.
Our Health and Welfare Benefits are designed to meet your needs, eligible on your first day of employment:
Medical, Dental, and Vision coverage
Company-matched Retirement plan
Generous Paid Time Off and Company Holidays
Life Insurance and AD&D coverage
Short-Term Disability (STD) and Long-Term Disability (LTD)
Tuition Assistance, along with optional life and pet insurance
Access to Corporate Discounts
This information is transparently provided in adherence to several state and local Equal Pay and Pay Transparency Laws, with our base pay determined by market location.
Join us at Bureau Veritas, where your well-being and professional growth are our top priorities.
...could have on the food service industry. There's a seat at our table for you... 2nd Shift Warehouse Package Handler Distribution Center Address: 225 Solar Dr., Imperial, PA Pay: Starting at $20.55/hour ~ Plus, earn two pay raises in your first year...
...Job Description Job Description We are lookingto hire an Office Manager to join our team! You will be responsible for overseeing the administrative activities of the organization. Responsibilities: Manage records and information Plan and maintain work facilities...
...Your Contribution As a Manager of Logistics reporting to the Plant Manager- Murfreesboro, you will be a key member of the Plant Leadership Team, serving as a true business partner to the Plant Manager. The overall objective is to develop short-term and long-term...
...A remote survey panel organization is seeking a Data Entry Clerk for an entry-level position. This role allows you to work from home with maximum flexibility and earn extra income. Ideal candidates are self-motivated individuals who enjoy data entry tasks and can follow...
...leader in blood health dedicated to improving patient outcomes through precision medicine and transfusion science. As a Medical Laboratory Scientist, youll perform critical immunohematology testing and ensure the safe and accurate provision of blood products for transfusion...